Concrete Trench Drains in the Lower Mainland
Concrete trench drains coordinated for water volume, slope, outlet, grate loading, maintenance, and surrounding slab elevations.

What belongs in the scope
A trench drain only performs when the channel, outlet, and surrounding grades work together. The scope should identify expected flow, drain size, grate load class, invert and outlet elevations, waterproofing or seals, reinforcement, concrete encasement, joints, cleanouts, and how adjacent slabs direct water to the channel.
Plan the site before the pour
Verify underground services and the receiving storm or process system before excavation. In operating facilities, plan temporary drainage, isolation, traffic routes, cleaning, and cure time. Manufacturer details and current civil or mechanical information should be coordinated before forms are set.
Concrete Trench Drains planning questions
How is the grate selected?
Pedestrian, vehicle, forklift, and industrial loads differ. Use a grate and channel system rated for the expected traffic and environment.
What if the outlet is too high?
The drainage concept must be revised before construction. Channel depth, outlet route, sump or pump options, and surrounding grades should be reviewed by the project team.
How are trench drains maintained?
Provide removable grates, accessible cleanouts or sumps, and a cleaning plan suited to the sediment or process material the drain will receive.
Plan your concrete project
Tell us what you are planning, where the work is located, and the best way to reach you.
Request a quote